Structural
IAPMO load tables for construction types II–V, signed and sealed by BEI Engineering. Up to 42,000 plf LRFD in bearing and 2,420 plf in shear with a 2.0 safety factor.
Home / Service Area / Maine
The longest heating season we serve and the strongest case for an R-61 wall: Portland and the southern coast, the Kennebec and Penobscot valleys, the western mountains, Downeast and Aroostook. We draw, price and deliver panel packages to every one of the 99 towns below from our base in Keene, New Hampshire.
Code and compliance in Maine
Maine’s Uniform Building and Energy Code applies in most municipalities of any size, and a documented effective R-51 to R-61 assembly exceeds its envelope requirements comfortably.
IAPMO load tables for construction types II–V, signed and sealed by BEI Engineering. Up to 42,000 plf LRFD in bearing and 2,420 plf in shear with a 2.0 safety factor.
Two-hour load-bearing, one-hour load-bearing and two-hour non-load-bearing assemblies, plus STC-rated assemblies for party walls. The assembly tests as non-combustible.
Intertek thermal performance assessment, ASTM E283, E331 and E330 air and water penetration testing, and 185 mph hurricane certification.
The Maine climate
The colder the town, the wider the gap between a code-built wall and a thermally broken R-51 to R-61 panel, and the faster the difference pays back. See what an R-61 wall does to a January heating bill.
7,000 to 8,000 heating degree days. Heating energy in a panel house typically falls 70 to 75% against the code-built version of the same plan.
8,000 to 9,500 heating degree days. Heating energy in a panel house typically falls 70 to 75% against the code-built version of the same plan.
On the Maine coast
On exposed sites we specify the hurricane panel, tested and certified to 185 mph including flying debris to the Florida and Miami-Dade protocol. The steel is galvanised and fully enclosed behind the cladding, there is no wood in the assembly to rot, and a shell that closes in days makes a short coastal building window workable. More in building on the New England coast.
Questions from Maine
The panel package costs more than a lumber package. The finished wall usually costs less, because the panel replaces framing, insulation, sheathing and vapour barrier and cuts framing labour by roughly half, then the mechanical system shrinks by about 50%. We will price it both ways so you can see the whole picture rather than one line of it.
The steel is galvanised and fully enclosed behind whatever cladding you choose. There is no organic material in the assembly for moisture or salt to attack, and nothing that feeds mold or mildew in a house that sits closed for months.
This is where panels earn their keep on the coast. The shell closes in days rather than weeks, and nothing in the assembly has to dry before the next trade can start.
The hurricane panel is designed, tested and certified to withstand 185 mph including flying debris, to the Miami-Dade protocol, and carries Florida Product Approval and a Miami-Dade Notice of Acceptance. Both documents are on our resources page. Our guide to building on the New England coast covers wind, salt air and moisture.
Usually yes. We take the as-built dimensions off what is actually in the ground rather than off the original drawings, and panelize to them, so the package arrives square to reality.
Regularly. Interior panels are used for party walls, thermal separations and inserted floors within existing buildings, and the 3.5 inch panel is thin enough not to eat the floor plan.
It depends on what is left of the original structure. What we can tell you precisely is what a new panel shell costs delivered, so you have a real number on one side of the comparison instead of two estimates.
Every town we serve
Worth reading
Hurricane panels tested to 185 mph including flying debris, and nothing in the wall to rot. What steel SIPs mean on the Maine, Cape Cod and Rhode Island coast.
No minimum project size. How steel SIP panels suit tiny homes, cabins and lake camps: 45 lb panels, owner-builder friendly, R-28 to R-61 walls, off-grid ready.
Keene runs past 7,000 heating degree days a year. Here is what that means in oil, propane and cord wood when the wall changes.
Send plans, a sketch or a description with rough dimensions. You get a panel take-off and a delivered price at no cost, with freight to your town as a quoted line item.