The baseline
A 2,000 sq ft code-built house in Wareham typically wants somewhere between 700 and 850 gallons of oil a year, or the propane, pellet or cord wood equivalent. That is the number a percentage saving has to be measured against.
Home / Service Area / Wareham, MA
Coastal building in Wareham means salt air, wind-driven rain, a compressed season and, increasingly, a hard conversation about what the building has to survive.
Coastal · Plymouth County
Exposure on the weather side, conservation and shoreland setbacks, sandy or ledgy soils, and a labour market that disappears into seasonal work at exactly the wrong moment.
There is no wood in the assembly to rot in salt air and no OSB skin to delaminate when it gets wet — a real distinction from timber framing and from foam-and-OSB SIPs. The hurricane panel is tested and certified to 185 mph including flying debris under the Florida and Miami-Dade projectile protocol, with eleven studs on the exterior face. Air and water penetration are tested under ASTM E283, E331 and E330.
What we typically supply in Wareham: coastal homes, seasonal-to-year-round conversions, guest cottages, small hospitality and marine-adjacent buildings.

The arithmetic in zone 5A
Zone 5A runs roughly 5,500 to 6,500 heating degree days — a long enough heating season that the envelope, not the equipment, sets what the building costs to run.
A 2,000 sq ft code-built house in Wareham typically wants somewhere between 700 and 850 gallons of oil a year, or the propane, pellet or cord wood equivalent. That is the number a percentage saving has to be measured against.
At an effective R-51 to R-61 with the studs thermally broken from the exterior face, heating energy typically falls 70 to 75% — on the order of 189 to 255 gallons. At current delivered prices that is thousands of dollars a year, every year the building stands.
A design load that low lets the mechanical system be sized at roughly half. Smaller equipment, smaller ductwork, less dedicated electrical service, and on solar-paired projects a smaller array and battery bank. That money never leaves the construction budget.
Baselines are typical for the climate zone and floor area, not a promise about your building. Send plans and we will run the numbers on the actual design.
Four products, one panel
Each panel bonds light gauge galvanised steel structural members to EPS with a patented composite joining technology, and does the work of four separate trades. That is why the framing phase for an average house is about three days rather than three weeks.
5.5″ or 7.5″ thick, up to 4′ × 12′, effective R-51 to R-61, up to 42,000 plf LRFD, ready for direct application of the final cladding.
Load bearing, so trusses open to every 4–6 ft. Two panels connect at the ridge for cathedral ceilings and A-frames with no intermediate support.
3.5″ at R-28 for partitions, tiny homes and quiet rooms; ceiling panels pre-chased and ready for direct sheathing.
Concrete floor panels span up to 50 ft with minimal shoring and cut concrete volume by around 40%; below-grade panels are rated for foundation and retaining walls.
How it works
Architect’s drawings, a plan-service set, or a hand sketch with rough dimensions and a note about storeys and roof. We will tell you what is missing.
We panelize the building on paper and return a package and a delivered price to your Wareham site — no cost, and an honest comparison against building it the usual way.
Two to four weeks. Our drafters work with your architect and engineer: every panel numbered, every rough opening located, beams and headers integrated.
Panels arrive bundled in wall-line order with track, screws and hardware. One framer and two helpers close in an average house in about three days.
Code and compliance in Massachusetts
Massachusetts building here means the base energy code and, in many municipalities, the stretch code or the specialised opt-in code. The panel clears the envelope requirements of all three without exterior continuous insulation.
IAPMO load tables for construction types II–V, signed and sealed by BEI Engineering. Up to 42,000 plf LRFD in bearing and 2,420 plf in shear with a 2.0 safety factor.
Two-hour load-bearing, one-hour load-bearing and two-hour non-load-bearing assemblies. EPS smoke and flame spread, self-ignition and flash ignition data. STC-rated assemblies for party walls.
Intertek thermal performance assessment, thermal zone map, ASTM E283, E331 and E330 air and water penetration testing, HUD Bulletin 1072 compliance and documented manufacturing tolerances.
Questions from Wareham
The hurricane panel is designed, tested and certified to withstand 185 mph including flying debris, to the Miami-Dade protocol, and carries Florida Product Approval and a Miami-Dade Notice of Acceptance. Both documents are on our resources page.
The steel is galvanised and fully enclosed behind whatever cladding you choose. There is no organic material in the assembly for moisture or salt to attack, and nothing that feeds mold or mildew in a house that sits closed for months.
This is where panels earn their keep on the coast. The shell closes in days rather than weeks, and nothing in the assembly has to dry before the next trade can start.
Yes. We supply the whole of New England from our base in Keene, New Hampshire, with panels manufactured in Radford, Virginia. Freight to Wareham is a quoted line item on the estimate, not a surprise at the end, and it is a small number against what the wall saves over the life of the building.
The panel package costs more than a lumber package. The finished wall usually costs less, because the panel replaces framing, insulation, sheathing and vapour barrier and cuts framing labour by roughly half — then the mechanical system shrinks by about 50%. We will price it both ways so you can see the whole picture rather than one line of it.
Send plans, a sketch or a description with rough dimensions to our team. You get a panel take-off and a delivered price at no cost, usually within a few days, plus a note on anything in the design that is fighting the system while it is still cheap to change.
Plans, a sketch or a napkin. We will tell you what the panel package costs delivered to your site — and what it saves against stick framing.